Concrete Calculator

To find how much concrete you need, multiply length × width × thickness in feet and divide by 27 to get cubic yards. One 80 lb bag of premixed concrete makes about 0.60 cu ft and a 60 lb bag makes about 0.45 cu ft, so one cubic yard (27 cu ft) takes about 45 bags of 80 lb or 60 bags of 60 lb. A 10 × 10 ft slab 4 in thick is 1.23 cubic yards before waste.

Worker in gloves smoothing a fresh backyard concrete slab with a hand float, with a wheelbarrow and stacked concrete bags behind
Floating a fresh backyard slab poured from bagged concrete. Illustrative image, AI-generated.

How the concrete calculator works

It works out the volume in cubic feet, adds your waste allowance and converts to cubic yards (27 cu ft per yard) and cubic meters. Bag counts use the yields printed on common US premixed concrete bags. Most of them round up, because a part bag still means buying a whole one.

rectangle: volume (cu ft) = length (ft) × width (ft) × thickness (in) ÷ 12
round: volume (cu ft) = π × (diameter (in) ÷ 24)² × depth (ft)
cubic yards = volume × (1 + waste %) ÷ 27
bags = volume × (1 + waste %) ÷ bag yield, rounded up
Bag sizeYield per bagBags per cubic yard
80 lb0.60 cu ft (17 L)45
60 lb0.45 cu ft (12.7 L)60
50 lb0.375 cu ft (10.6 L)72
40 lb0.30 cu ft (8.5 L)90

The ready-mix figure is rounded up to the next quarter yard, since many suppliers sell in those steps. Ask your supplier about their minimum order and short-load fees, they vary a lot.

Bags or a truck?

Bags make sense for post holes, small pads and repairs. Once you're past about one cubic yard (45 bags of 80 lb, around 3,600 lb of material) mixing by hand gets hard to do in one go, and that's usually when people price a ready-mix delivery.

Worked example

A 10 × 10 ft patio slab, 4 in thick, with 10% extra.

  • Volume: 10 × 10 × (4 ÷ 12) = 33.3 cu ft
  • In cubic yards: 33.3 ÷ 27 = 1.23 cu yd
  • With 10% waste: 36.7 cu ft, or 1.36 cu yd (1.04 m³)
  • 80 lb bags: 36.7 ÷ 0.60 = 61.1, so 62 bags
  • 60 lb bags: 36.7 ÷ 0.45 = 81.5, so 82 bags
  • Ready-mix: order 1.5 cu yd

And for four 12 in round post holes 4 ft deep: each hole is π × 0.5² × 4 = 3.14 cu ft, so 12.6 cu ft in total, or 13.8 cu ft with 10% waste. That's 24 bags of 80 lb.

FAQ

How many bags of concrete are in a yard?

About 45 bags of 80 lb concrete, 60 bags of 60 lb, 72 bags of 50 lb or 90 bags of 40 lb make one cubic yard (27 cu ft). Those counts use the usual yields of 0.60, 0.45, 0.375 and 0.30 cu ft per bag.

How much concrete do I need for a 10x10 slab?

A 10 × 10 ft slab at 4 in thick is 33.3 cu ft, or 1.23 cubic yards. With 10% extra that’s about 62 bags of 80 lb concrete or 1.5 yards of ready-mix.

How thick should a concrete slab be?

Patios and walkways are commonly poured 4 in thick. Driveways and slabs that carry vehicles are often 5–6 in. Local code and your soil matter here, so check before you pour anything structural.

How much extra concrete should I order?

Plan for 5–10% extra. Uneven ground, forms that bow out and spillage all eat into the total, and running short in the middle of a pour is a much bigger problem than a few spare bags.

What does an 80 lb bag of concrete make?

About 0.60 cubic feet once mixed. A 60 lb bag makes about 0.45 cu ft. Check the yield on the bag you buy, since mixes differ.